Poster, SNMMI 2018
Samy Bertrand, Jean-Michel Geets, Benoit Nactergal, Fabienne Devillet, Eric Kral, Sebastien de Neuter, Jozef Comor, Francisco Alves
The cyclotron design is completed and the first units are already running in daily production. The complete design and first prototype validation were delivered in less than two years [1]. The UZ Brussel (Belgium) became today one of the State of the Art PET radioisotope production centres, achieving large batches of 18F with a cost-efficient industrial cyclotron solution.